News, views and advertising of the Grand Coulee Dam Area
CITY OF
ELECTRIC CITY
STATE
ENVIRONMENTAL POLICY ACT
Determination of NonSignificance
Proposal Name: Electric City Shoreline Waterfront Trail
Lead agency: City of Electric City
Description of proposal: This City initiated project constructs about 2,153 feet of 8-10 ft wide multi use trail adjacent to Highway 155 between Electric City and Grand Coulee.
Additional work includes removal of existing guardrail, installation of retaining wall with pedestrian safety fence and drainage facilities to accommodate path.
Location of proposal: The proposed path project is located in the southeast quarter of Section 10, Township 28 North, Range 30 East, W:M in Grant County, Washington.
Work will occur within the right-of-way of Hwy 155 between Electric City and Grand Coulee adjacent to Banks Lake.
The City of Electric City has determined that this proposal will not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030.
This decision was made after review of a completed environmental checklist and other information on file with the lead agency.
This information is available to the public on request from the Electric City City Hall.
This DNS is issued under WAC 197-11-340(2). The lead agency will not act on this proposal for 14 days from the date issued.
Comments must be received by 4:00 pm on June 6, 2024
Agency Contact:
Peggy Nevsimal,
City Clerk,
10 Stevens Avenue, Electric City, WA 99123 (509) 633-1401
Responsible Official: Diane Kohout, Mayo
Responsible Official:
Diane Kohout, Mayor
Issue Date:
May 22, 2024
Appeal Process: An appeal of this determination must be submitted to the Electric City City Hall within fourteen (14) calendar days after the date issued.
The appeal must be written, and specific factual objections made to the City’s threshold determination.
Appeals will be conducted in accordance with City policy.
Pursuant to WAC 197-11-680, appeals shall be limited to a review of the final threshold determination.
(Publish May 22 & 29, 2024)
Notice of
Change of Regular Meeting date for Public Hospital District No. 6, Douglas, Grant, Lincoln, & Okanogan Counties, Washington
Public Hospital District No. 6, Douglas, Grant, Lincoln, and Okanogan Counties, Washington; which operates Coulee Medical Center and Coulee City Medical Clinic, will be changing the regular board meeting date for May.
The next board meeting will be held
Tuesday, May 28th, 2024 at 6:00 pm
Town of Nespelem
Public Hearing
Notice is hereby given that the Town of Elmer City will hold a Public Hearing on Thursday, June 12th at 5:30 p.m. to consider the Six Year Comprehensive Street Program for 2024 – 2029. All interested persons will be given opportunity to provide written or oral comment at said meeting. City Hall is located at 330 9th Street and is accessible to the handicapped. To join the meeting via Zoom, call City Hall for instructions.
Morgan Allen Clerk/Treasurer 509-634-4691
Publish May 22 & 29, 2023
CALL FOR BIDS
Colville Confederated Tribes
Mushroom Corner Roadway Improvements
Nespelem, Washington
Closing Date: May 30, 2024 @ 10:30 A.M. /P.S.T
Sealed BID Opening Date: May 30, 2024 @ 11:00 A.M. /P.S.T. and publicly read aloud at CCT DOT. .
A mandatory pre-bid conference with the CCTDOT will be held at 10:00 AM on Tuesday, March 21, 2024, at the CCTDOT office.
The improvements for which bid will be received are generally described below:
Includes approximately, 1,980 cubic yards of crushed surfacing, 1,600 tons of hot mix asphalt, 7,785 square yards of full depth reclamation, temporary traffic control, and related miscellaneous items.
Bidding Documents may be examined and obtained at Spokane Regional Plan Center; Northwest Association of General Contractors; Associated Builders and Contractors; Seattle Daily Journal of Commerce Plan Room; Builders Exchange of Washington; Wenatchee Plan Center; Tri-Cities Plan Center; and Contractor Plan Center, Milwaukie, Oregon; online at http://www.tdhplanroom.com ; online at https://www.colvilletribes.com/rfp ; the Colville Confederated Tribes Department of Transportation, 23 Nespelem – San Poil Street, Nespelem, WA, on Mondays through Thursdays between the hours of 8:00 a.m. – 4:00 p.m .; and the office of the Engineer, TD&H Engineering, 303 E. 2nd Avenue, Spokane, WA, on Mondays through Fridays between the hours of 8 a.m. – 5 p.m.
(Publish May 8, 15 and 22, 2024)
CALL FOR BIDS
Colville Confederated Tribes
Lower and Upper Loop Homes Roadway Improvements
Nespelem, Washington
Closing Date: May 30, 2024 @ 9:30 A.M. /P.S.T.
Sealed BID Opening Date: May 30, 2024 @ 10:00 A.M. /P.S.T. and publicly read aloud at CCT DOT.
A mandatory pre-bid conference with the CCTDOT will be held at 10:00 AM on Tuesday, May 21, 2024, at the CCTDOT office.
The improvements for which bid will be received are generally described below:
Includes approximately 125 cubic yards of roadway excavation, 2,650 cubic yards of crushed surfacing, 2,150 tons of hot mix asphalt, 10,690 square yards of full depth reclamation, temporary traffic control, and related miscellaneous items.
Bidding Documents may be examined and obtained at Spokane Regional Plan Center; Northwest Association of General Contractors; Associated Builders and Contractors; Seattle Daily Journal of Commerce Plan Room; Builders Exchange of Washington; Wenatchee Plan Center; Tri-Cities Plan Center; and Contractor Plan Center, Milwaukie, Oregon; online at http://www.tdhplanroom.com ; online at https://www.colvilletribes.com/rfp ; the Colville Confederated Tribes Department of Transportation, 23 Nespelem – San Poil Street, Nespelem, WA, on Mondays through Thursdays between the hours of 8:00 a.m. – 4:00 p.m .; and the office of the Engineer, TD&H Engineering, 303 E. 2nd Avenue, Spokane, WA, on Mondays through Fridays between the hours of 8 a.m. – 5 p.m.
(Publish May 8, 15 and 22, 2024)
Reader Comments(0)