Sixty-eight years ago

 

Last updated 3/1/2017 at 12:16pm

John Berry, a Bureau of Reclamation engineer, observes tensiometer readings of the cable pull during puller machine tests used for maneuvering the floating caisson, maintaining contact with shore stations by short-wave radio. These tests were made by the Pacific Bridge Company, a contractor, as part of repairs made to the spillway bucket section of Grand Coulee Dam. - March 9, 1949 photo

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024