FOR SALE
SURPLUS SCHOOL BUS
Grand Coulee Dam School District is offering the following school bus for sale:
Bus #112
Capacity: 72 passengers
VIN: 1BABJCPA9CF283600
Mileage: 131,854 miles
The vehicle is being declared surplus by the Grand Coulee Dam School District.
Interested parties may contact Wade with the Grand Coulee Dam School District Transportation Department @ 631-3210 for additional information, inspection arrangements, and bidding.
Please state “bid” on the envelope
All bids due to the District Office by Thursday Sep 3rd by 3:00 p.m.
110 Stevens Ave
Coulee Dam, WA 99116
The School District reserves the right to reject any or all offers.
(Publish August 19 and 26, 2026)
SUMMARY OF
ORDINANCES PASSED
OF THE CITY OF
ELECTRIC CITY, WA
Full and complete copies of the below ordinances are available at City Hall, 10 Stevens Avenue, Electric City, WA during normal working hours.
On the 14th day of April 2026, the City Council of Electric City passed the following ordinance. A summary of the content of said ordinance, consisting of the titles, provides as follows:
Ordinance #: 617-2026
“An ordinance of the City of Electric City
updating Section 8.12.050
of the Electric City
Municipal Code titled “Fireworks.”
On the 14th day of April 2026, the City Council of Electric City passed the following ordinance. A summary of the content of said ordinance, consisting of the titles, provides as follows:
Ordinance #: 618-2026
“An ordinance of the City of Electric City amending the 2026 Budget.”
On the 14th day of May 2026, the City Council of Electric City passed the following ordinance. A summary of the content of said ordinance, consisting of the titles, provides as follows:
Ordinance #: 619-2026
“An ordinance of the City of Electric City amending the 2026 Budget.”
On the 14th day of July 2026, the City Council of Electric City passed the following ordinance. A summary of the content of said ordinance, consisting of the titles, provides as follows:
Ordinance #: 620-2026
“An ordinance of the City of Electric City updating Chapter 2.55 of the Electric City Municipal Code titled “Uniform Polices for Citizen Boards and Commissions.”
(Publish August 26, 2026)
Northwest Native Development Fund
RequestforProposals
ConstructionServicesforNewBuildCorrection sand ExteriorCompletion FDR Estates
Issuedby:NorthwestNativeDevelopmentFund
Introduction
The Northwest Native Development Fund (“NNDF”) is soliciting proposals from qualified, licensed, and insured contractors to provide construction services for modifications to a new residential build located in FDR Estates. The work includes corrective framing, window and door modifications, structural and exterior repairs, and installation of exterior finish components, all arising from view restrictions and conditions relating to the building site and the immediate surroundings.
Qualified contractors are invited to submit proposals to complete the work described in this Request for Proposals (“RFP”).
1. Project Overview
This project involves corrective and completion work on a new build in FDR Estates. The selected contractor will be responsible for furnishing all labor, supervision, tools, equipment, and materials necessary to complete the scope of work in a professional and workmanlike manner and in accordance with applicable codes, manufacturer requirements, and industry standards.
2. Scope of Work
The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the following:
A. WindowModifications
A. Window Modifications
Remove and replace trapezoid windows above the sliding glass door
- Remove existing trapezoid windows.
- Reframe the opening as needed.
- Order and install new windows.
- New windows must align with the slope of the vaulted ceiling and be sized correctly to fit theopening.
B. Entry Door Modifications
Add sidelites to both sides of the front entry door
- Install sidelites on both sides of the front entry door.
- Sidelite dimensions: **1’-3” x 5’-0”** each.
- Modify framing and finishes as required for proper installation.
C. Framing Corrections
Furr out the girder truss above entry and stairs
- Adjust/furr out girder truss to match ridge beam support.
Frame in/box out knee walls - Box out and frame knee walls as needed to allow for proper air sealing and insulation.
D. Deck Repairs
Replace outer deck joists
- Replace the following deck joists:
- 13 pieces of 2x8x8’
- 14 pieces of 2x8x10’
E. Front Porch Repairs
Replace front porch columns
- Remove and replace weather-exposed and delaminating front porch columns.
- Existing columns are approximately 5 1/8” x 5 1/2” Glu Lam columns.
- New columns shall be properly installed, protected, and finished for exterior use.
F. Exterior Envelope Repairs
Replace weather-damaged exterior sheathing
- Remove and replace damaged sheathing where necessary.
- Reinstall and/or patch building wrap to maintain weather barrier continuity.
G. Exterior Finish Installation
Install siding
- Install exterior siding as required.
- All siding shall be installed per manufacturer specifications and applicable building code requirements.
Install garage door
- Provide and install garage door, including hardware and accessories necessary for proper operation, unless otherwise noted by owner.
3. Contractor Responsibilities
The selected contractor shall:
- Verify all field dimensions and existing conditions prior to beginning work.
- Obtain and coordinate all necessary permits, if required, unless otherwise directed by the owner.
- Provide all labor, materials, equipment, tools, supervision, disposal, and incidentals necessary to complete the work.
- Maintain a safe and clean jobsite throughout the project.
- Protect completed and existing work from damage.
-Coordinate procurement of ordered materials to minimize delays.
- Ensure all work complies with local building codes and applicable regulations.
- Meet budgeted or estimated bid costs for work, and time schedule for completion of work
4. Proposal Requirements
Interested contractors should include the following in their proposal:
A. Company Information
- Business name
- Address
- Contact person
- Phonenumber
- Emailaddress
B. ContractorQualifications
Description of relevant experience with residential construction, framing corrections,
exterior envelope work, siding, window/door installation, and related services
- List of similar completed projects
C. Licensing and Insurance
- Proof of current contractor license
- Proof of general liability insurance
- Proof of workers’ compensation coverage
- Any other relevant certifications
D. Project Approach
- Brief description of how the contractor intends to complete the work
- Proposed schedule and estimated duration
- Lead times for ordering windows, garage door, and other materials
E. Cost Proposal
- Lump sum total cost
- Itemized breakdown by scope category, if available
- Clearly identify allowances, exclusions, or assumptions
5. Evaluation Criteria
Proposals may be evaluated based on the following criteria:
- Relevant experience and qualifications
- Completeness and responsiveness of proposal
- Proposed cost (including but not limited to thoroughness of cost proposal without a material risk of the use of change orders)
- Ability to meet schedule requirements
- References and past performance
- Licensing, insurance, and overall contractor responsibility
The Northwest Native Development Fund reserves the right to reject any or all proposals, waive informalities, and select the proposal deemed to be in the best interest of the organization. Grounds for not selecting any proposal can include insufficient cost proposals
While NNDF cannot guarantee confidentiality relating to any proposal received, NNDF will not voluntarily provide material information about any proposal and the evaluation criteria, to anyone but the entity submitting the proposal.
Proposals submitted to NNDF may be supplemented or changed at any time prior to
6. Schedule
The anticipated schedule is as follows:
- RFP Issued: 08/17/2026
- Deadline for Questions: 09/01/2026
- Proposal Due Date: 09/01/2026
- Contract Award Notification: 09/15/2026
- Anticipated Start Date: As soon as possible
7. Site Visit
A site visit may be required or recommended prior to proposal submission. Contractors are encouraged to inspect the project site and verify existing conditions before submitting a bid.
Site Visit Information: Please call to schedule a site visit.
8. Submission Instructions
Proposals shall be submitted to:
Northwest Native Development Fund
Jordan R Ruiz
Executive Director
504 Fir St, Coulee Dam, WA 99116
509-633-9940
Proposal Deadline: 09/01/2026
-Proposals may be submitted by mail or hand delivery. Late submissions may not be considered.
9. Terms and Conditions
- The Northwest Native Development Fund reserves the right to request additional information from any proposer.
- The organization reserves the right to modify or cancel this RFP at any time.
- The selected contractor may be required to enter into a formal construction agreement prior to beginning work.
10. Questions
All questions regarding this RFP shall be directed to:
Jordan R Ruiz
Northwest Native Development Fund
509-633-9940
(Publish August 26, 2026)