Pedestrian/bike path project still in the works for Electric City
Last updated 9/16/2020 at 8:30am
A pedestrian/bike path along SR-155 that would connect the Coulee Playland area to Banks Lake Park is still in the works.
With the path in the design phase currently, the path between the north end of Electric City and the south end of Grand Coulee would be completed in 2021.
The vision for the pathway is a half-mile-long paved area less than 10 feet wide on the lake side of the guardrail a...
For access to this article please
sign in or
subscribe.
Reader Comments(0)